Every report tracked to closure at Indorama Eleme.
Indorama Eleme is a major fertilizer and petrochemical complex. Its safety team wanted more of what happens on the ground to be reported, investigated, and closed, without the paper chase that had grown around the old process. Raven Incident now runs that workflow every day, on mobile and web, online and offline.
- Registered users
- 1,000+
- Plants & units live
- 8
- Reports processed
- 1,000+
- Investigations closed
- 500+
Friction every paper-based program knows.
Forms filled in after shift, often incomplete. Classification that varied by reporter. Full analysis reserved for the serious events. Action registers split across departments and spreadsheets. Reports compiled by hand before every review meeting.
The same workflow, without the drag.
The chain, measured.
more events reported
Reporting that takes two minutes gets used. Events that went unreported start showing up. Measured against the pre-rollout baseline.
investigations closed
With the analysis drafted on arrival, the events that used to be skipped get investigated.
actions closed on time
Owner, due date, and evidence required, with escalation before items go overdue.
fewer repeat events
Patterns surface early, so the fix lands before the third similar event. In covered areas.
Deployed for one workflow. Expanded three times on customer pull.
- 01
Near-miss reporting
The first workflow: two-minute capture, AI-drafted investigation, closure tracking.
- 02
Unsafe acts & conditions
The daily, highest-volume signals joined the same flow on customer pull.
- 03
Safety observation rounds
Structured coaching rounds with injury-potential ratings and area trends.
- 04
Incident investigation
Formal reporting, full analysis, and lessons released plant-wide.
All six core modules are live today, with one login, one action register, and dashboards matched to the plant's management routines.
What another plant can take from this.
- Frontline adoption is the constraint that matters: capture has to be easier than not reporting
- Start with one workflow and expand on pull, rather than deploying everything at once
- Map plants, departments, units, and role groups as they exist; the workflow should follow the plant
- One action register across sources is where the operating change becomes visible
- Live in days, not months: the first usable release should not wait for the full program
See the same workflow on your plant's terms.
Bring your current process to the demo. We will show how capture, investigation, actions, and dashboards map to it.